MCM have been awarded the re-roofing works at Talisker Distillery on the Isle of Skye, AlkorPlan mechanically fixed membrane roofs were selected as the preferred specification and include upgrades to the existing roof areas insulation.
Works are due to be concluded before the end of 2014, MCM originally installed the MCM Replica Lead system on the Still House back in 1994 and this year represents the projects twenty year anniversary.